BENFORD v. OH DOT, Unpublished Decision (3-16-2005)


2005-Ohio-1397

Catherine M. Benford Plaintiff, v. Ohio Department of Transportation Defendant.

No. 2004-10779-AD.Court of Claims of Ohio.
March 16, 2005.

[EDITOR’S NOTE: This case is unpublished as indicated by the issuing court.]

Catherine M. Benford, 45001 Kipton Nickle Plate Rd., Oberlin, Ohio 44074, Plaintiff, Pro se.

Gordon Proctor, Director, Department of Transportation, 1980 West Broad Street, Columbus, Ohio 43223, for Defendant.

MEMORANDUM DECISION FINDINGS OF FACT {¶ 1} 1) On November 10, 2004, plaintiff, Catherine M. Benford, was traveling west on U.S. Route 20 just west of Route 301 in Lorain County, when her automobile struck a massive pothole causing damage to the vehicle.

{¶ 2} 2) Plaintiff filed this complaint seeking to recover $187.88, the cost of automotive repair which plaintiff contends she incurred as a result of negligence on the part of defendant, Department of Transportation, in maintaining the roadway. Plaintiff included filing fee reimbursement in her damage claim. Total damages claimed amount to $212.88.

{¶ 3} 3) Defendant has denied liability based on the fact it had no knowledge of the pothole prior to plaintiff’s property damage occurrence.

{¶ 4} 4) Plaintiff filed a response to defendant’s investigation report. However, plaintiff has not submitted any evidence to indicate the length of time the pothole existed prior to the incident forming the basis of this claim.

{¶ 5} 5) Defendant has asserted maintenance records show no pothole patching operations were needed in the general vicinity of plaintiff’s incident during the six-month period preceding the November 10, 2004, property damage event.

CONCLUSIONS OF LAW {¶ 6} 1) Defendant has the duty to keep roads in a safe, drivable condition. Amica Mutual v. Dept. of Transportation (1982), 81-02289-AD.

{¶ 7} 2) In order to recover on a claim of this type, plaintiff must prove either: 1) defendant had actual or constructive notice of the defect (pothole) and failed to respond in a reasonable time or responded in a negligent manner, or 2) that defendant, in a general sense, maintains its highways negligently. Denis v. Department of Transportation (1976), 75-0287-AD.

{¶ 8} 3) There is no evidence defendant had actual notice of the damage-causing pothole.

{¶ 9} 4) The trier of fact is precluded from making an inference of defendant’s constructive notice, unless evidence is presented in respect to the time the defective condition (pothole) developed. Spires v. Highway Department (1988), 61 Ohio Misc. 2d 262.

{¶ 10} 5) Size of the defect (pothole) is insufficient to show notice or duration of existence. O’Neil v. Department of Transportation (1988), 61 Ohio Misc. 2d 297.

{¶ 11} 6) In order for there to be constructive notice, plaintiff must show sufficient time has elapsed after the dangerous condition (pothole) appears, so that under the circumstances, defendant should have acquired knowledge of its existence. Guiher v. Jackson (1978), 78-0126-AD.

{¶ 12} 7) No evidence has shown defendant had constructive notice of the pothole.

{¶ 13} 8) Furthermore, plaintiff has failed to show defendant negligently maintained the roadway.

ENTRY OF ADMINISTRATIVE DETERMINATION
Having considered all the evidence in the claim file and, for the reasons set forth in the memorandum decision filed concurrently herewith, judgment is rendered in favor of defendant. Court costs are assessed against plaintiff. The clerk shall serve upon all parties notice of this judgment and its date of entry upon the journal.